hotel-xenia
  • Home
  • Selling
    • Selling Your Property
    • Your Strategy
    • Your Marketing
    • Unique & Distinctive Homes
    • Our Fees
  • Auctions
    • Sell your property via Auction
    • Buy Auction Property
  • Landlords
  • Properties
    • Our Properties
    • VIP Buyers Club
    • Property Finder
  • Valuations
  • Blog
  • Our Story
Contact Match Property
North Devon Landlord Update: Mandatory five-year electrical safety check regulations to be enforced

North Devon Landlord Update: Mandatory five-year electrical safety check regulations to be enforced

Published on January 15, 2020 On Letting, Property News

The Government has proposed detailed regulations for enforcing mandatory five-year electrical safety checks in the private rented sector from July this year.

The Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020 were laid in Parliament yesterday. They require approval from both the House of Commons and the House of Lords before they come into force.

New requirements for mandatory electrical safety checks

The draft regulations propose that, from 1 July 2020, all new private tenancies in England will need to ensure that electrical installations are inspected and tested by a qualified person before the tenancy begins. The landlord will then need to ensure that the installation is inspected and tested at least every five years – and more often if the most recent safety report requires it.

For existing tenancies, an electrical safety test will need to be carried out by 1 April 2021, with regular tests following this as outlined above.

The regulations will apply to all properties across the private rented sector, including houses in multiple occupation (HMOs), although lodger arrangements where the tenant shares accommodation or amenities with the landlord or their family are excluded. These regulations will replace the existing requirements for HMOs regarding electrical installation testing and inspection.

A ‘qualified person’ for the purposes of these regulations is a person competent to undertake the inspection and testing required and any further investigative or remedial work in accordance with the electrical safety standards.

Local authorities can impose a financial penalty of up to £30,000 for a breach of the regulations. Where there are multiple breaches, the local authority can impose multiple penalties.

Electrical safety reports

Once the electrical installation has been tested, the landlord must:

  • Ensure they receive a written report from the person conducting the inspection, which includes the results and the required date for the next inspection
  • Supply a copy of this report to each existing tenant living in the property within 28 days of the inspection
  • Supply a copy within seven days to the local authority, if they request a copy
  • Keep a copy of the report until the next inspection, and give a copy to the person undertaking the next inspection.

For new tenancies, the landlord must:

  • Give a copy of the most recent report to a new tenant before the tenant occupies the property
  • Give a copy of the most recent report to any prospective new tenant who requests the report in writing, within 28 days of receiving such a request.

Remedying any faults

If the electrical safety report identifies a fault or potential fault, which the landlord must either investigate further or repair, the landlord must ensure further investigations or repairs are completed by a qualified person within 28 days of the inspection, or within the timeframe set out in the report if this is shorter.

Following these further investigations or repairs, the landlord must ensure they receive written confirmation that these have been carried out and that either the electrical safety standards are met, or further work is required.

This confirmation must be supplied to each existing tenant within 28 days of the work being undertaken, along with the original report identifying further work is required.

This process must be repeated until the electrical installation is found to be compliant.

Enforcement

If a landlord breaches the above requirements, the local authority has a duty to act. Where urgent works are not required, the local authority must serve a ‘remedial notice’ on the landlord. This must be served within 21 days of the local authority deciding it has reasonable grounds to act. The landlord will have 28 days from the date of service of the notice to take the action outlined, or must make written representations within 21 days if they disagree with the notice.

Once the landlord has made written representations, the remedial notice is suspended until the local authority responds – which must be within seven days. If the local authority confirms the notice, the suspension ceases, and the landlord has 21 days to comply with the requirements.

If the tenants of the property refuse access to the landlord for these remedial works, the landlord will not be considered to have breached this duty purely because they have not brought legal proceedings to access the property.

If the landlord does not undertake the remedial works, the local authority can access the property with the tenants’ permission to remedy the issue. The local authority must serve notice to the landlord informing them of this action – to which the landlord can appeal to the First-tier Tribunal. Local authorities can also recover costs reasonably incurred from the landlord.

Where urgent remedial works are required and the landlord has not undertaken these, the local authority can arrange for the works to be undertaken. The local authority must inform the landlord within seven days of the works commencing.

For more information and advice on these changes and the many other recent and pending regulations contact Nic Chbat on 01271 410108 or email nic@matchproperty.co.uk

Recent Posts

North Devon buyers act like it’s a ‘buyers market’ ! Make this work to your advantage.
Feb 4 Buyers are acting like it’s a buyers market…because it is! If there’s one house and...
Your Selling Price – How To Tip The Balance In Your Favour
Jan 27 Your Selling Price – How To Tip The Balance In Your Favour Whether you are...
The six weeks that will decide if North Devon sellers will sell well – or not
Jan 21 Best time to sell a house in North Devon – The six weeks that will...
Selling Smart in the North Devon property market 2026 – It’s a new dawn but will it be a new life for you?
Jan 3 If 2024–2025 felt like a long, awkward pause in the North Devon property market, you’re...
By Ember and North Star: Finding Buyers in North Devon’s Silent Night
Dec 7 Your North Devon house selling guide to December. 2025 tested your nerve. Double council-tax premiums...

Categories

  • Buying
  • Letting
  • Property News
  • Selling
  • Uncategorized

About Match Property

We use our many years of expertise and local knowledge to create solutions for customers that go beyond the traditional ‘estate agency’ model.

01271 410108

enquiries@matchproperty.co.uk

https://www.matchproperty.co.uk

3 Paiges Lane, Barnstaple, Devon EX31 1EF

Previous Post Next Post

01271 410108

enquiries@matchproperty.co.uk

https://www.matchproperty.co.uk

1 Enterprise Road, Roundswell, Barnstaple EX31 3YB

COPYRIGHT © 2021 ALL RIGHTS RESERVED MATCH PROPERTY - WEBSITE DESIGN BY WILLCOXMEDIA
  • Complaints Procedure
  • Privacy Policy
  • Terms of Use
  • Property Blog
  • Advice Meeting
  • Contact

We have hundreds of potential buyers waiting to find the home of their dreams...

01271 410108

enquiries@matchproperty.co.uk